Planned Maintenance Policy

Scope

Covers planned changes to an AppsCode-supported platform: upgrades (hub, spoke, imported clusters), migrations (e.g. helm-based → Flux-based installation), bulk cluster import/removal, and any other change scheduled in advance.

Unplanned critical/high severity incidents are handled by the on-call rotation (see below).

Rules

  1. 72-hour notice. Notify AppsCode at least 72 hours before the change, with:
    • What changes (e.g. v2026.10.12 → v2026.11.30)
    • Affected clusters
    • Date/time window, with timezone
    • Non-prod test result
    • Your contact during the window
  2. Test before production. Apply the change to a QA/non-prod environment first and verify it with the post-checks in the upgrade SOP.
  3. Or coordinate. If non-prod testing isn’t possible, agree a maintenance window with AppsCode within the 72-hour notice period; an AppsCode engineer will be available during it.

Unplanned issues

Critical and high severity production issues go to AppsCode’s on-call rotation, independent of any single engineer’s availability. For planned changes, following the rules above lets us have the right engineer ready and resolve issues fastest.